Tuesday 13 July 2021

Concrete laid for North Station tram terminus

The concrete track base at the terminus of the new Talbot Road tramway extension
The concrete track base is now in place for the North Station tramway terminus, adjacent to the new Holiday Inn hotel on Talbot Road in Blackpool. There is only a short section of concrete track base remaining to be laid now, between the terminus and the curve to the east of the crossover.

The steel framework for the new Holiday Inn hotel, with the concrete track base visible at the right

No comments:

Post a Comment